Don Pedro Visitor Center

Public Facilities, Parks, & Site Improvements

  • Location: County of Tuolumne

Scope of Work

Don Pedro Reservoir on the Tuolumne River is a major regional facility that provides water storage, power generation, flood control, and recreation. Originally built to support Central Valley irrigation, the reservoir has grown into an important multi-benefit resource serving agricultural, municipal, and recreational interests. The Visitor Center Expansion included reconfiguration of the existing facility and development of a new, approximately 18,000-square-foot visitor center featuring office space, a public lobby, event center, wrap-around service desk, expanded parking, and an outdoor gathering lawn, all designed to enhance the visitor experience, improve site circulation, and provide flexible space for public programs and educational opportunities. PCE, in collaboration with Unum, provided civil engineering services for the site development improvements. PCE’s scope included site surveying, grading design, utility plans, and conceptual landscape and irrigation plans for the parking lot expansion, coordinating closely with the design team to integrate civil improvements with the architectural layout, parking configuration, outdoor gathering areas, and utility infrastructure. PCE also provided construction administration support for permitting and bidding, including agency coordination, plan clarification, and technical support during construction documentation. Through these efforts, PCE helped deliver a functional, well-coordinated visitor center expansion supporting the long-term public use and operational needs of this important regional facility.

Browse More Projects

Fresno Chaffee Zoo

Precision Civil Engineering, Inc. (PCE) is currently under contract with Fresno Chaffee Zoo to provide ongoing professional...

Learn More
Construction

N. Hayes Avenue Street Reconstruction and Widening

The Hayes Avenue Street Reconstruction and Widening project involved...

Learn More

Ashlan Avenue Street Widening at Hayes Avenue

The Ashlan Avenue Street Widening at Hayes Avenue project involved roadway improvements...

Learn More
HSR

California High-Speed Rail

The Merced to Sacramento project section is 110 miles long, running north from Merced Station through Modesto...

Learn More

Castle Test Track

The project consists of a 2.2-mile oval track with intersections and traffic signals to simulate roadway applications...

Learn More

Fresno State Football Field

PCE was responsible for the civil engineering and design of the Bulldog Stadium Field Improvements and the artificial...

Learn More

Marketplace at El Paseo

Precision Civil Engineering, Inc. (PCE) provided expertise in civil engineering and land surveying services...

Learn More
riverstone park

Parks & Community Designs

PCE was responsible for surveying services and developing a master plan for the proposed 40-acre park in...

Learn More
riverstone_development

Riverstone

PCE assisted with developing all necessary permitting documents for the construction of facilities to serve the project with...

Learn More

Selma-Kingsburg-Fowler Sanitation District

PCE serves as the On-Call Engineer for the Selma-Kingsburg-Fowler County Sanitation District...

Learn More

Visalia Public Cemetery Westside Expansion

The Visalia Public Cemetery District initiated the Westside Expansion Project to address...

Learn More
12 and 41 Fresno

Avenue 12 and Highway 41 Widening

The Avenue 12 and Highway 41 Widening project involved the design and...

Learn More
Veteran's Center

Veterans Home

Precision Civil Engineering, Inc. (PCE) prepared grading and drainage plans, and sewer, water, and storm drainage plans...

Learn More